Metallic, insulated flexible ductwork
BS EN 13180 defines flexible ductwork as: 'Duct which can be manually longitudinally compressed or decompressed and flexed without permanently damaging the cross section area'
Structural Fixings for Ductwork Systems BG 10/2010, By Glenn Hawkins, Published by BSRIA in 2010, lists the following types of flexible ductwork:
- Metallic, uninsulated flexible ductwork
- Metallic, insulated flexible ductwork
- Non-metallic, uninsulated flexible ductwork
- Non-metallic, insulated flexible ductwork
- Acoustic flexible ductwork
It suggests that metallic, insulated flexible ductwork is most commonly composed of:
- An inner core of aluminium and polyester laminate supported by an encapsulated high-tensile steel wire helix
- Fibreglass, mineral wool or microfibre insulation
- An outer core of aluminium and polyester laminate.
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles and news
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this.






















